Wickliffe/Cairo Bridge

A contractor for the Kentucky Transportation Cabinet has asked to delay the start of repairs on the U.S. 51 Ohio River Bridge between Wickliffe, Ky. and Cairo, Ill. until after July 7.

During the repairs, the bridge will have a 7-foot maximum load width, which means an 80-mile detour for commercial drivers.

In a press release, KYTC spokesman Keith Todd said the agency wants truckers and suppliers who depend on the 76-year-old river crossing to be fully prepared for the coming project, which will last about two months.

Traffic will be restricted to one lane this week on the US 51/60/62 Ohio River Bridge between Wickliffe, Kentucky, and Cairo, Illinois.