kytc http://wkms.org en NTSB Issues Findings in Eggners Ferry Bridge Crash http://wkms.org/post/ntsb-issues-findings-eggners-ferry-bridge-crash <p>The National Transportation Safety Board says the January 2012 allision between the cargo ship the Delta Mariner and the Eggners Ferry Bridge resulted from poor bridge span lighting and crew inattention to available navigational tools. The ship sheared off a 300 foot span of the bridge that crosses Kentucky Lake. No one was injured.&nbsp;</p> Tue, 14 May 2013 21:18:38 +0000 Chad Lampe 31645 at http://wkms.org NTSB Issues Findings in Eggners Ferry Bridge Crash KYTC Prepares for Winter Storm http://wkms.org/post/kytc-prepares-winter-storm <p></p><p>Kentucky Transportation Cabinet crews are geared up to respond to a Christmas night snowstorm that is expected to create travel issues overnight on Tuesday and through the day on Wednesday.</p><p>Before they left work on Friday, KYTC crews across Western Kentucky fueled their trucks, loaded them with salt, and mounted snow plows so they can be prepared to roll out as quickly as possible as the storm develops. Mon, 24 Dec 2012 20:26:30 +0000 Keith Todd 26062 at http://wkms.org KYTC Prepares for Winter Storm I-69 Work Continues Near Dawson Springs http://wkms.org/post/i-69-work-continues-near-dawson-springs <p></p><p>Work begins next year to reconstruct an interchange for the Interstate 69 project across western Kentucky. Governor Steve Beshear announced this week that a Muhlenberg County contractor will head the $5 million interchange project near Dawson Springs. The work will rebuild the cloverleaf interchange into a diamond-shaped interchange. Thu, 20 Dec 2012 18:49:01 +0000 Angela Hatton 25943 at http://wkms.org I-69 Work Continues Near Dawson Springs High Winds Create Hazardous Driving Conditions http://wkms.org/post/high-winds-create-hazardous-driving-conditions-0 <p></p><p>The Kentucky Transportation Cabinet says high speeds today and tonight could make driving hazardous. The National Weather Service has issued a wind advisory, indicating the region can expect sustained winds above 20 miles per hour with gusts as high as 50 miles per hour at times through tonight. Thu, 20 Dec 2012 17:05:07 +0000 Angela Hatton and Keith Todd 25933 at http://wkms.org High Winds Create Hazardous Driving Conditions Eggners Ferry Bridge Lane Restriction Set for Dec. 11-12 http://wkms.org/post/eggners-ferry-bridge-lane-restriction-set-dec-11-12 <p></p><p>The Kentucky Transportation Cabinet plans to restrict traffic to one lane on the US 68/KY 80 Eggners Ferry Bridge on Tuesday and Wednesday next week.</p><p>This lane restriction is to allow deck repairs to better prepare the bridge for winter driving weather.&nbsp; This work zone will include an 8 ft. maximum load width. Fri, 07 Dec 2012 21:55:03 +0000 Keith Todd 25447 at http://wkms.org Eggners Ferry Bridge Lane Restriction Set for Dec. 11-12 Weekend/Night Work to Restart on US 45 http://wkms.org/post/weekendnight-work-restart-us-45 <p></p><p>A contractor for the Kentucky Transportation Cabinet plans to resume lane restrictions for northbound traffic along US 45/Lone Oak Road near Interstate 24 Exit 7 in McCracken County for weekend and night work starting at 8 p.m. Fri, 07 Dec 2012 15:29:47 +0000 Keith Todd 25414 at http://wkms.org Weekend/Night Work to Restart on US 45 $13.4M to Fund I-24 Asphalt Upgrades in McCracken Co. http://wkms.org/post/134m-fund-i-24-asphalt-upgrades-mccracken-co <p></p><p>The Kentucky Transportation Cabinet has awarded $13.4 million for improvements to Interstate 24 in McCracken County. The project to replace asphalt pavement between Exits 3 and 16 begins in March. Grand Rivers-based Jim Smith Contracting Company will head up the project. It’s slated for completion by the end of September next year. Tue, 04 Dec 2012 17:35:14 +0000 Angela Hatton 25267 at http://wkms.org $13.4M to Fund I-24 Asphalt Upgrades in McCracken Co. Section of New Ledbetter Bridge Could Open in May http://wkms.org/post/section-new-ledbetter-bridge-could-open-may <p>Construction crews are on track to complete one section of the new Ledbetter Bridge by May of next year. The bridge will connect U. S. 60 between McCracken and Livingston counties. It replaces the current outdated bridge. Kentucky Transportation Cabinet spokesman Keith Todd says the state offered the bridge contractor 3.8 million dollars in incentives to finish a two-lane section by May, and all four lanes by October next year.&nbsp; Tue, 23 Oct 2012 17:52:56 +0000 Angela Hatton 23601 at http://wkms.org Section of New Ledbetter Bridge Could Open in May I-24 Bridge Work Brings Lane Restrictions http://wkms.org/post/i-24-bridge-work-brings-lane-restrictions <p>The Kentucky Transportation Cabinet plans to restrict traffic to one lane at various locations on Interstate 24 in McCracken County the week of October 22 to allow bridge inspection work. Fri, 19 Oct 2012 15:45:42 +0000 Keith Todd 23452 at http://wkms.org I-24 Bridge Work Brings Lane Restrictions Mowing Employee Injured on US 41 in Christian Co. http://wkms.org/post/mowing-employee-injured-us-41-christian-co <p>A commercial mowing company employee is being treated at Nashville’s Vanderbilt University Medical Center after being run over by a tractor on the right-of-way along US 41 in Christian County late Wednesday.&nbsp; The worker, who has not been identified, was part of a mowing crew working for the Kentucky Transportation Cabinet on US 41 near Pembroke. Thu, 13 Sep 2012 13:23:38 +0000 Todd Hatton 22041 at http://wkms.org Mowing Employee Injured on US 41 in Christian Co.