intech inc. http://wkms.org en Date Set to Begin Ledbetter Bridge Repairs http://wkms.org/post/date-set-begin-ledbetter-bridge-repairs <p>The Kentucky Transportation Cabinet will begin repairs to the US-60 Ledbetter Bridge Saturday. Intech, Inc., of Lexington, is the prime contractor of the nearly $95,000 repair project. The repairs aim to maintain the safety of the bridge while a new one is built upstream. A heavily enforced three-ton load restriction limits traffic on the bridge to mostly non-commercial vehicles. The bridge will be closed to all traffic from 8 pm Saturday, March 24 to 2 am on Sunday, March 25. and on April 6, the US 60 Ledbetter Bridge will be restricted to one lane of traffic.</p> Mon, 19 Mar 2012 21:11:50 +0000 Seth Helton 17294 at http://wkms.org